Altiplano Concentrate Processing Plant
The Altiplano Concentrate Processing Facility, situated on 20 hectares of owned land, is centrally located within a historic mining district containing one of the older epithermal zone in the country, is connected to very good transportation infrastructure, and is readily accessible to upwards of twenty small and medium production mining operations.
Once operating at capacity, the plant is designed to process 50 tons per day leading to an estimated annual production of 1.9 million ounces of silver and 48,000 ounces of fine gold (within two years); additionally, upwards of 16,500 tons of high-grade lead and copper concentrate is expected to be produced and resold at market prices.

